A low-cost Counter-UAS interceptor, in active development. This page describes the problem we are attacking and where the work stands. Technical detail is shared under private briefing.

Request a technical briefing →

// In development. Nothing on this page is a shipping product. No specifications, performance figures, or sourcing detail are published here.

// The Problem

Wrong side of the maths.

The cost of answering a small drone is currently far higher than the cost of sending one. Until that inverts, defending anything at scale is unaffordable. That is the problem this programme exists to attack.

// 01 What we are building

A low-cost interceptor

An attritable Counter-UAS interceptor designed around cost per engagement rather than maximum performance. The design constraint is that losing one should not be a budget event.

  • Cost engineered from the first sketch
  • Manufacturability-first design
  • Commodity parts wherever they will do
// 02 Who it is for

Intended users

Organisations that already carry a drone risk and cannot justify the cost of incumbent systems to answer it. Lawful civilian, public-safety and government applications only.

  • Public safety and law enforcement
  • Critical infrastructure operators
  • Government and allied agencies
  • Event and venue security
// Development Stage

Where the work stands.

Stated coarsely on purpose. Dates, test data, and design detail belong in a briefing, not on a public page.

// Stage 01

Concept and cost model

Target cost per engagement established, and the design approach chosen to reach it.

Complete
// Stage 02

Prototype development

Airframe and subsystem prototyping with our design and manufacturing partners.

In progress
// Stage 03

Testing and validation

Bench and flight testing against the performance envelope the cost model assumes.

In progress
// Stage 04

Partner integration

Working with manufacturing partners on producibility and repeatable assembly.

In progress
// Stage 05

Field evaluation with partners

Structured evaluation with selected operators under controlled, lawful conditions.

Next
// Stage 06

Production readiness

Sourcing, assembly and quality processes fixed and documented.

Planned

Timelines and test results are shared under briefing. We will not publish a date we cannot hold.

// Manufacturing

How it gets made.

We work with two design and manufacturing partners. They are not named publicly, and we do not describe sourcing on an open page.

// Approach

Manufacturability first

A design that cannot be built repeatably at cost is a research project, not a capability. Producibility is a constraint from the beginning rather than a problem handed to manufacturing at the end.

// On sourcing

What we will not claim

We are not describing this programme as domestically built. When sourcing and assembly support that claim, we will make it and we will be able to show it. Until then we would rather say less.